9/14/2004 - The upper cabinets are installed and Mike is putting the microwave in place.
4/5/2004 - The walls may not be done but the washer and dryer are hooked up and usable. Thank god for no more trips to the laundromat.
3/24/2004 - The framing is done and the electric is being wired. We still have much to do but it's a little easier to see how things will come together. The refrigerator is getting use to it's own little nook already.
2/10/2004 - From the inside looking thru where the kitchen will be and out onto the front deck. Not quite the open layout we had in mind for our dream house.

The reddish stick that looks like a birthday candle is what holds up my bedroom.
2/10/2004 - From the outside looking in thru the kitchen.
2/6/2004 - Part of the next new wall is done. This goes along the side of the house. This corner will be the laundry area.
1/21/2004 - The new back wall in place.
1/21/2004 - The beginnings of the new back wall - a few studs in place with the house's gaping hole covered by a tarp (it is freezing outside!).
1/11/2004 - The floor, post-demolition.
1/2/2004 - The kitchen/laundry room-to-be during demolition. The green thing in the corner is the old tub. The windows are so old they have weights to counterbalance the weight of the sash. The wall was obviously made to support a shack near a lake.